
Aerospace and aviation
Reports that hold up in an audit.
Reporting errors are caught at the inspection, not when an auditor traces the job back to the purchase order.
The work
Parts in the lab and aircraft in service.

Production inspection
Castings, forgings, machined parts, weldments, and composites, inspected in fixed labs.

MRO
Hangar, on-wing, engine, and landing gear work on aircraft in service.

Long-lived records
Records your customers keep for years after delivery, and trace back at audit.
What changes
On every job in this industry.
The right report the first time.
Each RT, VT, and UT indication is checked against the acceptance limits as it's entered. A rejected one shows the clause, the value, and the limit. The Evaluator signs on the device.
Your template, not ours.
Reports come out in your template, with your stamp.
Who it's for
One record. Both sides of the job.
Proof
Results measured in production.
Measured by Weld Done at Nordic NDT.
“I had to double-check and basically correct every report. With Weld Done, I don't have to do that double work anymore.”
How it works
Checked against the code at capture.
Signed at the job.
The report is built during the inspection.
Every weld, shot, and parameter on a phone or tablet. Capture, save, and sign with no signal.
Each RT, VT, and UT indication checked against the acceptance limits as it's entered, not after the report is written.
The report comes out in your own template, each field filled from the job's data.
Signed reports filed by job and delivered, with numbered revisions.
Equipment for every method, picked for the job
Codes behind the work
The codes this work runs on.
Personnel certification runs to NAS 410 or EN 4179; penetrant and magnetic particle work to ASTM E1417 and E1444.
- NAS 410NAS Certification and Qualification of Nondestructive Test PersonnelAerospace technician certification, employer-based with a Responsible Level III.US
- EN 4179Aerospace series — Qualification and approval of personnel for non-destructive testingThe European counterpart of NAS 410.International
- ASTM E1417Standard Practice for Liquid Penetrant TestingPenetrant testing process for aerospace parts.US · International
- ASTM E1444Standard Practice for Magnetic Particle TestingMagnetic particle testing process for aerospace parts.US · International
Ask us which of these your reports are built to today.
All 57 codes in the Library →FAQ
Questions from aerospace teams.
Every other answer is on the FAQ page.
Can each OEM customer have its own report form?
Yes. Each customer's form is built as its own template, and the tech's entries come out in whichever one the job needs.
Can an auditor trace a report back to the job?
Yes. Every signed report sits in the Portal with its job. Each signature carries the signer's cert level and the date, the report locks once it's signed, and any change after that makes a new numbered revision.
Does it work in the hangar with no signal?
Yes. Techs capture, save, and sign with no signal, and the report sends itself when the device is back online.
Which aerospace specs are in the Library?
NAS 410 and EN 4179 for personnel certification, and ASTM E1417 and E1444 for penetrant and magnetic particle work. Tell us your specs on the demo and we'll tell you which reports can be built to them today.

See your own report rebuilt.
Book a 30-minute demo on one of your real reports.
Not ready to talk? The calculator works out hours and costs back from your own numbers.


