Acceptance criteria
The limits a code sets on each kind of indication: how long, how deep, how many in a given length of weld. Inside them the weld is accepted; outside them it's rejected.

SeeAPI 1104 · ISO 5817

Acceptance standard
The code, or the part of a code, that a report's results are judged against, named on the report with its edition. It can differ from the document the method follows: ASME Section V sets the technique, while Section VIII sets the acceptance for a pressure vessel.

SeeASME Section V · ASME Section VIII

Authorized Inspector
The independent inspector, employed by an Authorized Inspection Agency and commissioned by the National Board, who verifies that ASME boilers and pressure vessels are built to the Code before they're stamped.

SeeASME Section VIII

C

Calibration block
A block of known material with machined reflectors, used to set up ultrasonic equipment before a scan so that echoes can be sized against something known.

SeeUT

Code
The published standard a weld is built and inspected to, such as API 1104 for pipelines or AWS D1.1 for structural steel. It sets the method, the procedure rules, and the acceptance criteria.

SeeCodes and standards

Code edition
The dated version of a code that a job is contracted to, such as the 22nd edition of API 1104. A report names it, because limits and requirements change from one edition to the next.

SeeThe API 1104 edition on the report · The ASME code's edition cycle

Couplant
The gel, oil, or water between an ultrasonic probe and the part. It carries the sound into the metal; without it the air gap reflects almost all of it.

SeeUT

CWICertified Welding Inspector
The American Welding Society's credential for welding inspectors, earned by examination under AWS QC1 and renewed on a fixed cycle. AWS D1.1 accepts it as the qualification of the inspector who signs visual inspection.

SeeAWS CWI · AWS D1.1

D

Daily and final reports
A daily report records one shift's work as the job goes, often in the field. The final report is the signed record of the inspection that goes to the client, and it's the one that counts at an audit.
Day rate / T&MTime and materials
How NDT service companies bill: a fixed rate per crew per day, or time and materials, the hours worked plus film, chemicals, and other consumables.
Defect
An indication that fails the code's acceptance criteria. Not every indication is a defect, which is why a report says indication until it has been evaluated.
DICONDEDigital Imaging and Communication in Nondestructive Evaluation
The standard file format for digital radiography images, built on the medical DICOM format, so an image keeps its shot settings and part data wherever it's opened.

SeeRT

Dig
An excavation that uncovers buried pipe so it can be inspected or repaired. Pipeline integrity work is often planned and counted in digs.
DR and CRDigital radiography / computed radiography
Radiography without film. DR uses a detector that turns the shot straight into an image; CR uses a reusable imaging plate that's scanned after the shot. Both are read on screen and stored as files.

SeeRT · ASTM E2698

E

Employer-based and central certification
The two ways NDT personnel are certified. Under SNT-TC-1A and CP-189 the employer certifies its own people against its written practice; under ISO 9712 and CGSB 48.9712 an independent body examines and certifies them.

SeeSNT-TC-1A · CP-189 · ISO 9712 · CGSB 48.9712

Encoded scan
An ultrasonic scan with a position encoder on the probe, so every reading is stored with where it was taken. Unlike a manual scan, the data file can be opened and read again later.

SeePAUT · ASTM E2700

Equipment calibration record
The instrument's serial number and the date its calibration falls due, written on every report so a result can be traced to equipment that was in calibration on the day.
Evaluator
The second certified person on a report, usually a Level II or Level III in the method, who checks the technician's results against the acceptance standard and signs them.
Examination record
ASME's name for the record an examination leaves: the procedure and its revision, the technique, the equipment, the results, and who did the work. Section V and the construction sections list what it must hold.

SeeASME Section V

F

Film density
How dark a developed radiograph is, measured with a densitometer. Codes set a density range for the area of interest, and a film outside it can't be interpreted.

SeeRT · ASTM E94

G

Girth weld
The circumferential butt weld that joins two lengths of pipe. Pipeline inspection is mostly girth welds, each with its own number on the weld log.

SeeAPI 1104 · CSA Z662

H

HAZHeat-affected zone
The band of base metal beside a weld that didn't melt but was heated enough to change its properties. Cracks and hardness problems often start there, so inspections cover it as well as the weld.
Hold point and witness point
Steps in an inspection and test plan where the client must be told before work goes on. At a hold point work stops until the client attends or releases it; at a witness point the client is invited, but work may continue.
Hydrostatic test
A pressure test with water: the line or vessel is filled and held above its design pressure for a set time to prove it doesn't leak or fail. Codes set the pressure, the hold time, and the records to keep.

SeeASME B31.3 · API 653

I

Imperfection
Any irregularity in a weld, before it's judged; US codes call it a discontinuity. ISO 6520-1 names and numbers each kind, and only one that exceeds the acceptance criteria is a defect.

SeeISO 6520-1 · ISO 5817

In-service inspection
Inspection of piping, vessels, tanks, and boilers already in operation, looking for corrosion, thinning, and cracking rather than welding flaws. API 510, 570, and 653, ASME Section XI, and the NBIC govern it.

SeeAPI 510 · API 570 · API 653

Incomplete fusion
Weld metal that didn't melt into the base metal or into the pass beneath it, leaving a thin unbonded plane. Also called lack of fusion; most codes reject it outright or allow very little.

SeeAPI 1104

Incomplete penetration
Weld metal that didn't reach through the root of the joint, leaving an unwelded gap on the far side. Radiographs show it as a straight dark line along the root.

SeeAPI 1104 · RT

Indication
Anything an NDT method shows that needs interpreting: a mark on a radiograph, an echo on a screen, penetrant bleeding out of a crack. Each one is recorded and evaluated against the code.

SeeISO 6520-1

Inspection plan
The set of NDT procedures a job starts from: which methods apply, to which code, and with which acceptance criteria, agreed before the work begins.
IQIImage quality indicator
A wire or hole-type gauge placed on the part for a radiographic shot. Seeing the required wire or hole on the image proves the shot was sensitive enough to show a flaw of that size.

SeeRT · ASTM E747 · API 1104

ITPInspection and test plan
The client-agreed list of every inspection and test on a job, in order, with who performs each one and where work must stop for the client.

L

Level I, II, and III
The certification levels for NDT personnel, held per method. A Level I runs tests under supervision; a Level II sets up, runs and interprets tests and signs the results; a Level III writes and approves procedures and qualifies the others.

SeeSNT-TC-1A · ISO 9712

Level III review
A Level III checking reports, procedures, or results before they go to the client: a sample of a job's reports, or every report on critical work. A report that fails it goes back for rework.

SeeThe Evaluator signs in the Field App

Linear and rounded indications
ASME's split for penetrant and magnetic particle results: an indication more than three times as long as it is wide is linear, anything else is rounded. The codes set tighter limits on linear ones, which can be cracks.

SeeASME Section VIII · PT · MT

M

MTMagnetic particle testing
Magnetizes the part and dusts or sprays it with iron particles, which gather where a crack at or just under the surface breaks the magnetic field. Ferromagnetic steels only.

SeeMT

MTRMill test report
The steel maker's certificate for a heat of material, giving its chemistry and mechanical test results. Weld logs and reports refer to it by heat number, so a weld can be traced to its material.

N

Nadcap
The aerospace industry's accreditation program for special processes, NDT among them. Aircraft and engine makers require it of the NDT suppliers in their chain.
NCRNonconformance report
The record raised when work or material doesn't meet the specification and isn't simply repaired and re-inspected: what was found, who decided what to do about it, and how it was closed.
NDT / NDENondestructive testing / nondestructive examination
Inspecting a weld or part without damaging it. The same thing under two names; ASME codes say NDE.

SeeNDT methods

P

PAUTPhased array ultrasonic testing
Ultrasonic testing with a probe of many small elements fired in sequence, which steers and focuses the beam to sweep a weld and build an image of it in one pass.

SeePAUT

PHMSAPipeline and Hazardous Materials Safety Administration
The US regulator for pipeline safety. Its rules for gas and liquid lines (49 CFR Parts 192 and 195) adopt API 1104 for welding and its inspection.

SeeAPI 1104 · ASME B31.8

Porosity
Gas pores trapped in weld metal as it solidifies, alone, in clusters, or in lines. Codes limit the size of each pore and how much porosity a length of weld may hold.

SeeAPI 1104 · RT

Procedure
The NDT company's own written instruction for running a method on a job: equipment, settings, technique, and acceptance criteria, citing the code it meets. A Level III approves it.
PTPenetrant testing
Coats the surface with a dye that seeps into open cracks, wipes it off, then applies a developer that draws the dye back out to show them. Surface-breaking flaws only, on almost any non-porous material.

SeePT

Q

Quality level
ISO's grading of weld acceptance: B is the most stringent, C intermediate, D moderate. The design or contract picks the level, and ISO 5817 sets the limits for each imperfection at each level.

SeeISO 5817 · ISO 10042

R

Reference level
In ultrasonic testing, the echo height from a known reflector in a calibration block, set to a fixed screen height. Indications are recorded and judged by how their echo compares with it.

SeeUT · ASME Section V

Repair rate
The share of welds rejected and repaired or cut out. Contractors and owners watch it as a measure of welding quality on a job.
Repair weld
A rejected weld that has been ground out or cut out and welded again. It's inspected again and keeps its original number with a repair mark, such as W12-R1.
Report signatures
The signatures that make an NDT report a record: the technician who did the work, a second certified person who evaluates the results, and often the client's representative. Each NDT signer is named with their method and level.
Report template
The layout a report is issued in: which fields, in what order, and under whose letterhead. Many clients require their own layout, so one NDT service company can keep dozens of templates.
Revision
A corrected report re-issued under the same number. The earlier version stays on file, marked superseded, so the record shows what changed.
Revision history
The numbered revisions of a report, each with its own signatures and date, kept so anyone can see which version was current when.
RTRadiographic testing
Passes X-rays or gamma rays through the weld onto film or a digital detector; voids, inclusions, and lack of fusion show as density changes on the image.

SeeRT

S

Scan plan
The drawing and settings that show how a phased array or automated ultrasonic scan covers a weld: probe positions, beam angles, and the volume each one reaches. The report carries it so coverage can be checked.

SeePAUT · ASTM E2700

Sensitivity
How small a flaw a test setup can show. In radiography it's proven by the IQI on each shot; in ultrasonic testing it's set against a reference reflector before the scan.

SeeRT · UT

Shot
One radiographic image, taken in a single firing of the X-ray tube or gamma source. A pipe weld usually takes several shots to cover its full circumference.

SeeRT

Sign-off
The point where a report becomes final: every required signature is on it, and the results can go to the client. A change after sign-off is made as a new revision.
Slag inclusion
Non-metallic slag from the welding flux left trapped in the weld, usually between passes when the joint wasn't cleaned. Radiographs show it as dark, irregular shapes.

SeeAPI 1104 · RT

Source-to-film distanceSFD
The distance from the radiation source to the film or detector, recorded for every shot. With the source size and the part's thickness it sets the geometric unsharpness, the blur codes cap so small flaws stay visible.

SeeASTM E94 · ISO 17636

Spread
A pipeline construction crew and its equipment, working one section of the line from clearing to backfill. NDT crews are assigned to a spread and keep pace with its welding.

T

Technique sheet
The setup a shot or scan used, written down for the report. For radiography that's the source and its distances, the film or detector, and the IQI; for ultrasonic testing, the probe, its angles, and the sensitivity settings.
Thickness gauging
Ultrasonic measurement of a wall's remaining thickness from one side. It's the core of in-service inspection, where readings at the same points over the years show how fast corrosion is thinning the wall.

SeeUT · API 570

Tie-in weld
The weld that joins two sections of pipeline already in place, often made in the ditch after each section is tested. Many owners and pipeline regulations call for every tie-in to be inspected.

SeeAPI 1104

Traceability
Being able to follow each result back to the weld, the welder, the procedure, the technician, and the equipment. A report that breaks the chain at any link can be rejected at audit.
Turnaround
A planned shutdown of a refinery or plant for inspection and repair. Much in-service inspection is packed into it, so NDT crews work to the shutdown's schedule.
Turnover package
The bundle of records handed to the owner when a job or system is finished: inspection reports, weld logs, test records, and material certificates. Also called a data book or dossier.

U

Undercut
A groove melted into the base metal along the edge of a weld and left unfilled. Codes limit its depth and length; visual inspection finds most of it.

SeeAPI 1104 · VT

UTUltrasonic testing
Sends high-frequency sound into the weld and reads the echoes that come back from flaws and from the far wall, which locates a flaw and sizes it.

SeeUT

UV-A light
The ultraviolet light, often called black light, under which fluorescent penetrant and magnetic particles glow. Codes set a minimum UV-A intensity at the part and a maximum of ordinary light around it.

SeePT · MT

V

VTVisual testing
Looking at the weld, with gauges, mirrors or a camera where needed, for surface flaws, profile, and size. Almost every weld gets it before any other method.

SeeVT

W

Weld inspection report
The signed record of an inspection: what was tested, by which method and procedure, by whom, to which code, and the result for every weld.
Weld log
The running list of welds on a job: each weld's number, the welder, the date, and where it stands in inspection.
Weld map
A drawing that locates every weld on a line or structure by number, so each result can be tied to a place in the field.
Welder tag
The identifier of the welder who made a weld, recorded against it so a reject can be traced to the welder and the welding procedure.
WPQWelder performance qualification
The test record showing that a welder can make sound welds under a given WPS. It's separate from the PQR, which qualifies the procedure, not the person.

SeeASME Section IX

WPS / PQRWelding procedure specification / procedure qualification record
The WPS is the written instruction for making a weld; the PQR records the test welds that prove the WPS produces sound joints. ASME Section IX and AWS D1.1 set the rules.

SeeASME Section IX · AWS D1.1

Written practice
The employer's own document under SNT-TC-1A or CP-189 that sets how it trains, examines, and certifies its NDT personnel at each level. An auditor checks certifications against it.

SeeSNT-TC-1A · CP-189

Y

Yoke and prods
The two hand-held ways to magnetize a part for magnetic particle testing: a yoke is a U-shaped electromagnet set across the area, and prods pass current through the part between two contacts.

SeeMT · ASTM E709