What reporting costs you today, and what comes back.

It opens on an example. Change any field to your own numbers and the math updates as you type.

NDT reporting today
Every inspection report your company sends out in a month, across all methods and crews.
Time to write one report after the inspection: typing up notes, filling in the template, adding photos. Not the inspection itself.
Field techs who write their own reports. Only used to show the hours back per technician.
What it costs you
What one technician hour costs you, all in: wage plus burden (payroll taxes, benefits, insurance, overhead).
Share of reports sent back or corrected after they go out, by your Level III or your client.
What one fix costs you, all in: everyone's time from the fix request to sending the corrected report.
With Weld Done
How much less time writing reports takes in Weld Done. The 85% was measured by Weld Done at Nordic NDT. It applies to writing time only.
Share of those fixes you expect Weld Done to prevent. Your own assumption; set it lower to be cautious.
Add Weld Done to your client invoices as a line item, so it costs you nothing a month.

Net to you each year

$136,560

Time back plus fixes avoided, minus Weld Done.

How it adds up, each month

  1. Time back$15,930

    354 hours × $45

    354 hours = 1,250 reports × 20 min ÷ 60 × 85% saved

  2. Fixes you stop paying for$7,950

    53 fixes × $150

    53 fixes = 1,250 reports × 5% fixed × 85% avoided

  3. Weld Done−$12,500

    1,250 × $10

    Per report. Each rate applies only to the reports in its tier.

Net each month$11,380

$11,380 × 12 months = $136,560 a year

Weld Done pays for itself on time alone once a technician hour is worth $35.31.

Modeled, not a quote. The math uses your numbers and the 85% cut in report writing time measured by Weld Done at Nordic NDT. Fixes avoided is your assumption, not a measured figure.

How we calculate it

Your numbers, one measured cut.

Hours back: your reports a month, times the minutes it takes to write one, divided by 60, times the share of report writing time Weld Done saves. Valued at what a technician hour costs you, wage plus burden.

Fixes you stop paying for: your reports a month, times the share sent back or corrected after they go out, times the share of those fixes you expect to avoid, times what one fix costs you, all in. Fixes avoided is your assumption; set it lower to be cautious.

Weld Done each month: your reports a month at the per-report rates on the pricing page. Each rate applies only to the reports in its tier, so the bill steps down as volume grows.

The 85% is the cut in report writing time measured by Weld Done at Nordic NDT. It applies to report writing only, never to a whole working day.

FAQ

Questions.

Every other answer is on the FAQ page.

Visit FAQ
Why apply the saving to report writing only?

Because that's what was measured: 85% less time writing reports, at Nordic NDT. Applied to a whole working day, it would overstate what comes back.

Is this money we bill?

No. It's inspection capacity: hours your technicians get back for inspection work instead of paperwork, plus the fixes you no longer pay for.

Where do the starting numbers come from?

They're an example to start from, set in the fields so you can see the sum work. Change any of them to your own and the result updates as you type.

How is Weld Done's monthly bill worked out?

Per report, by monthly volume. Each rate applies only to the reports in its tier, so the bill steps down as volume grows. The rates, and the per-user price, are on the pricing page.

See your own report rebuilt.

Book a 30-minute demo on one of your real reports.

Not ready to talk? The calculator works out hours and costs back from your own numbers.