The API 1104 edition on your report comes from the job, not the calendar.
The newest API 1104 is the 22nd edition, from 2021. Regulated pipelines work to the edition the regulation names, which can lag it, and the report has to say which one it was evaluated to.
Key takeaways
- The rules name a specific edition, which can lag the newest one.
- The edition comes from the regulation and the operator's specification, not from the template.
- Check the edition and the acceptance criteria applied, set when the job is set up.
The wrong code on a pipeline job is the mistake everyone knows. A tech who works structural most days picks AWS D1.1 on an API job, and every call in the report is made against the wrong criteria, even when the film was read right. It happens to techs with decades on the job.
The edition is the quieter version of the same mistake. The code on the report is right. The criteria in the template come from another edition.
Newest isn't the one that applies
API 1104 is the welding standard for pipelines. It covers the whole life of a pipeline weld: qualifying the procedure and the welder, making production welds, inspecting them, and repairing the ones that fail. The newest edition is the 22nd, from 2021.
It applies to new construction and to work on lines already in service. Welding onto a line that's still carrying product, such as a sleeve or a hot tap, has its own annex, because the flowing product pulls heat out of the weld.
It doesn't design the pipeline. Wall thickness, routing, and pressure come from the design codes, ASME B31.4 for liquid lines and B31.8 for gas, which point to API 1104 for the welding and its inspection. So one pipeline job can name several documents, and each has an edition.
That doesn't make the newest edition the one your job works to. PHMSA requires API 1104 for welding on gas pipelines (49 CFR 192) and hazardous liquid pipelines (49 CFR 195), and the rules name a specific edition, which can lag the newest one. So the edition a job works to is set by the regulation and the operator's specification, not by what's on the shelf.
Because the pipeline safety rules bring API 1104 in by reference, an API 1104 report isn't only a quality record. It's evidence the operator shows a regulator, and the operator keeps it for the life of the line.
Who sets it on a job
The operator's specification names the edition, and the contractor and the inspection company work to it. The technician works to the code and edition the job names, not the one they trained on or sat an exam for.
The same holds north of the border. The Canada Energy Regulator and the provincial regulators, such as the Alberta Energy Regulator, adopt CSA Z662 by reference, and each regulator sets the edition in force. On a Canadian line, the question is which edition the regulator for that jurisdiction has adopted, and what the operator's specification names.
None of this is new to a Level III. The trouble is that the answer lives in the job's paperwork, and the criteria live in a template that was built for a different job.
Where the edition shows up in the report
The edition isn't one line on the cover sheet. It decides several things further down.
The acceptance criteria. API 1104 judges each imperfection by its type first, then by its size and how much of it there is along the weld. The report names the edition and which acceptance criteria were applied.
The alternative criteria. API 1104 has an annex with alternative acceptance criteria, based on fracture mechanics, for girth welds where the operator has qualified them. Those limits apply only when the job is set up for them, so the report has to say which criteria were used.
The image quality. API 1104 picks the image quality indicator from the wall thickness being radiographed, and the report records the IQI type and the essential wire or hole seen. Check the table in the edition the job works to, not the one in last year's template. Without the IQI and the essential wire on the report, nobody can show the image was sensitive enough to find what it should have found.
The rest of the report hangs off the same job: the line or spread and location, the weld ID, the welder and the welding procedure used, the pipe diameter, wall thickness, and material. For radiography, the source or kV, film or detector, source-to-film distance, exposure time, and shot layout. For each indication, its type, location, and size, and the accept or reject call. Then the final disposition of each weld.
A reject needs its trail. If the weld was cut out or repaired, the report has to show the re-inspection that closed it. A reject with no repair trail is the report an integrity engineer pulls years later and can't close.
Make the edition part of the job
Here's our view: the edition belongs to the job, not to the template. When it's printed into a template header, it gets copied onto every job that template touches, whether the specification agrees or not.
Set the edition and the acceptance criteria when the job is set up, from the operator's specification. Put them on the report as fields. Have the reviewer check them first, before any indication, because every call below depends on them.
In Weld Done the job starts from your inspection plan, so its procedures come with it, and the report is built from the job as the inspection happens.
See how it works on the Standards logic page, or read why NDT service companies switch from Excel and PDF. The NDT reporting checklist has eight ways to get reports right the first time.
Author
Who wrote it.

See your own report rebuilt.
Book a 30-minute demo on one of your real reports.
Not ready to talk? The calculator works out hours and costs back from your own numbers.