AWS D1.1 moved inspection to Clause 8. Check what your template cites.
In the 2020 edition of AWS D1.1, inspection is Clause 8. Earlier editions put it in Clause 6, and a template built before the change still sends the reader to the old clause.
Key takeaways
- Inspection is Clause 8 in the 2020 edition. Earlier editions put it in Clause 6.
- The edition comes from the contract documents and the project specification, not from the template.
- Check every clause number in the template: header, column labels, notes.
Talk to NDT service companies about why reports come back from review, and old templates come up again and again. A template is right the day someone builds it. Then it gets copied from job to job, long after the code under it has moved on, and one bad template can run across a whole crew for months before anyone catches it.
AWS D1.1 is a clean example, because one edition change moved the clause every structural inspector cites. The work didn't move. The number did.
What changed
In the 2020 edition of AWS D1.1, inspection is Clause 8. It covers the inspector's duties, visual inspection of every weld, and the radiographic and ultrasonic testing the contract documents call for. Earlier editions put inspection in Clause 6.
This article is about the numbering, not about what changed inside the clause. For the acceptance criteria themselves, work from the edition the job names. Our Library page on AWS D1.1 is written to the 2020 edition, the one Weld Done holds data for.
Which edition a job works to isn't up to the technician. Building codes in the US bring in the AISC specification for structural steel, which calls for welding to AWS D1.1, and the project specification usually sets the inspection extent and any extra criteria. Check the specification before you check the template.
Where the old numbering hides
Clause references end up in more places than people expect. A template header can name the code and the clause. The acceptance column on a visual form can carry the clause its table came from. A UT form can cite the clause behind its rating. A written procedure points back at the code it was written to.
Each of those can still say Clause 6 on a job that works to the 2020 edition. Nobody typed anything wrong. They used the form they were given.
One feature prospects respond to is a defect call that has to carry a justification and a code citation. We think that's right. But a citation is only as good as the edition behind it, and a citation that points at the wrong clause is worse than none, because it looks checked.
What the report has to say
A D1.1 report has to let a Level III check every call without phoning the tech. That starts with three things.
The edition. The report states which edition of AWS D1.1 the welds were evaluated to, so the clause references can be read against it.
The loading. D1.1 separates statically loaded connections, like most buildings, from cyclically loaded ones, like crane girders, and the acceptance criteria differ. A report that doesn't say which one it used can't be checked, and a cyclically loaded member called against statically loaded limits lets through flaws the code would reject.
The working behind each call. For each indication: its location, its length, its rating or size, its class, and the accept or reject call. A UT report that gives a class without the decibel values behind it leaves the reviewer nothing to check.
Around those sit the fields every structural report carries: the project, drawing, member, and joint ID, the welding procedure and whether it's prequalified or qualified, the welder, the material and thickness, the disposition of each weld with its repair and re-inspection, and the technician's name, certification, signature, and date.
And the contract on top. Contract documents can add to the D1.1 criteria or call for testing the code doesn't require, so the engineer's specification is part of the acceptance standard on every job. A template can't know that. The job setup can.
Not every steel job is D1.1
The same template check is worth doing for the codes next to D1.1. Highway bridges are welded and inspected to AWS D1.5, the Bridge Welding Code, not D1.1, and a building template on a bridge job is the wrong code before it's the wrong edition.
In Canada, welded steel construction works to CSA W59. Building codes there adopt CSA S16 for steel structures, which requires welding to W59, and the provinces adopt the building code, so the edition in force can vary from one province to the next. Our Library page is written to W59-18. A company that works both sides of the border carries two codes, two editions, and, usually, two sets of templates.
How to check a template
Pull every report template that carries AWS D1.1 and read it for clause numbers: the header, the column labels, the notes, the fine print under the signature block. Write down every one you find.
Check them against the edition your current contracts name, not the newest edition and not the one you trained on. Where the template prints a clause, ask whether it needs to print it at all, or whether the report can state the edition once and let the reviewer take it from there.
Make the edition and the loading fields the tech fills in, not text printed into the header. A field gets answered on every job. A header gets copied.
Then issue the corrected template and retire the old copies, on every laptop and in every shared folder. One current template, on every job, is the whole point of the exercise.
Where Weld Done fits
In Weld Done the job starts from your inspection plan, so its procedures come with it, and the report comes out of the job rather than out of last month's file.
See how it works on the Standards logic page, or read why NDT service companies switch from Excel and PDF. The NDT reporting checklist has eight ways to get reports right the first time.
Author
Who wrote it.

See your own report rebuilt.
Book a 30-minute demo on one of your real reports.
Not ready to talk? The calculator works out hours and costs back from your own numbers.