ASTM E165: liquid penetrant testing for general industry.
The ASTM practice that sets how liquid penetrant testing is done outside aerospace: the penetrant types and methods, the process steps, and the records. Acceptance comes from the code the job is built to.
What it covers
ASTM E165 in plain terms.
E165 is the general-industry practice for liquid penetrant testing. It describes how a penetrant is applied to a clean surface, left to dwell, removed, and drawn back out of any surface-breaking flaw by a developer, so the flaw shows as a colored or fluorescent indication.
It classifies the materials. Type I penetrants fluoresce under UV-A light and are viewed in a darkened area; Type II penetrants are visible dyes viewed in white light. Methods A, B, C, and D describe how the excess penetrant comes off: water wash, lipophilic emulsifier, solvent wipe, or hydrophilic emulsifier. Developers come as dry powder, water-soluble, water-suspendible, and nonaqueous forms.
It sets the process: pre-cleaning, penetrant and developer dwell, drying, the light levels for viewing, and post-cleaning. Parts and materials are kept within a standard temperature range; outside it, the practice gives a way to qualify the procedure with a cracked comparator block.
E165 sets no acceptance criteria. The code that references it decides what an indication means. ASME Section V carries it as SE-165, and AWS D1.1 and API 1104 name it for penetrant testing. For aerospace parts, ASTM E1417 takes its place and adds QPL materials and process controls.
Regulation
ASME Section V carries E165 as SE-165 and builds Article 6 on it; AWS D1.1 and API 1104 name it as the penetrant procedure. The acceptance criteria stay with each of those codes.
- Full title
- Standard Practice for Liquid Penetrant Testing for General Industry
- Issued by
- ASTM International
- Current edition
- ASTM E165/E165M, edition to confirm
- Applies to
- Surface-breaking flaws in non-porous metals and some non-metals, in fabrication, maintenance, and repair
- Penetrant systems
- Type I fluorescent and Type II visible; Methods A, B, C, and D by how the excess is removed
- Acceptance comes from
- The referencing code, such as AWS D1.1, API 1104, or the ASME construction code
- Aerospace twin
- ASTM E1417, which adds scheduled process controls and AMS 2644 materials
- Personnel
- SNT-TC-1A or CP-189, as the employer's written practice sets
Who it's for
One record. Both sides of the job.
How inspection works
Methods under ASTM E165.
Who sets the procedure, who sets acceptance, and who may do the work, method by method.
| Method | Procedure | Acceptance | Certification |
|---|---|---|---|
| Penetrant (PT), visible | ASTM E165, Type II | The code the job is built to | SNT-TC-1A or CP-189 Level II |
| Penetrant (PT), fluorescent | ASTM E165, Type I | The code the job is built to | SNT-TC-1A or CP-189 Level II |
Acceptance criteria
How a weld passes or fails.
E165 makes the penetrant test valid; the referencing code decides what passes.
- The surface is cleaned and dried before the penetrant goes on, because anything left in a flaw keeps the penetrant out.
- Penetrant dwell and developer dwell run for at least the times the procedure sets, at a temperature inside the standard range or one the procedure has qualified.
- Excess penetrant is removed by the method the procedure names, without washing it out of the flaws, and the surface is checked under the right light before developing.
- Type I indications are viewed under UV-A light of measured intensity in a darkened area; Type II indications are viewed under measured white light.
- Indications are evaluated against the acceptance criteria of the referencing code, and relevant indications are recorded by location and size.
ASME Section V Article 6 adds its own written-procedure and demonstration requirements on top of SE-165.
A summary, not the code. Limits and exceptions are in the edition your job works to.
The report
What ASTM E165 reports have to carry.
The fields a Level III checks before signing. Miss one and the report comes back.
- Item, weld or part ID, material, and surface condition
- Procedure and revision, E165 type and method, and the penetrant, remover, and developer used, with batch numbers
- Penetrant dwell, developer dwell, and the temperature of the part and the materials
- Light: UV-A intensity and ambient light for Type I, white light for Type II
- Each relevant indication: location, length, and whether it's linear or rounded
- Acceptance criteria applied and the accept or reject result
- Technician name, SNT-TC-1A or CP-189 level, and date
Where reports go wrong
The ASTM E165 mistakes that send a report back.
How the job's procedures come from your plan
The NDT reporting checklist: eight ways to get reports right the first time
Over-washing.
Too much water pressure or too long a wipe pulls penetrant out of shallow flaws. The test looks clean and isn't.
Dwell cut short.
Penetrant needs time to enter a tight crack, and developer needs time to draw it back out. A short dwell on either side hides flaws.
Cold or hot parts.
Outside the standard temperature range the penetrant behaves differently. The practice has a qualification step for that, and skipping it leaves the result unproven.
Acceptance read from E165.
It has none. The code that referenced it sets what an indication means.
Related codes
The codes around it.
FAQ
Questions.
Every other answer is on the FAQ page.
What is ASTM E165?
The ASTM practice for liquid penetrant testing in general industry. It sets the materials, the process steps, and the records, and leaves acceptance to the referencing code.
What's the difference between ASTM E165 and E1417?
E165 is the general-industry practice. E1417 is the aerospace practice: it requires materials from the AMS 2644 qualified products list and adds scheduled process controls.
Does ASTM E165 set acceptance criteria?
No. The code or specification that calls for it does, such as AWS D1.1, API 1104, or the ASME construction code.
What are penetrant Types I and II and Methods A to D?
Type I is fluorescent, Type II is visible dye. Methods A, B, C, and D describe how the excess penetrant is removed: water wash, lipophilic emulsifier, solvent, or hydrophilic emulsifier.

See your own report rebuilt.