Code
ASME Section V: how nondestructive examination is done.
The part of the ASME Boiler and Pressure Vessel Code that sets how each examination method is performed. The construction code that calls for it sets acceptance.
What it covers
ASME Section V in plain terms.
Section V is a methods book. Each article sets the requirements for one examination method: the written procedure, equipment, calibration, technique, and what the examination record has to show.
It doesn't decide whether a weld passes. Section V applies when another code calls for it, such as Section VIII for a pressure vessel, Section I for a boiler or B31.3 for process piping, and that code sets the acceptance criteria.
Subsection A holds ASME's own articles. Subsection B adopts ASTM standards, such as the wire IQI standard, with ASME's own designations.
Every examination runs to a written procedure, and some articles require that procedure to be demonstrated before it's used on production work.
Where it’s used: Oil, gas, and petrochemical
In the glossary: Acceptance standard · Examination record · Reference level
Regulation
States, provinces, and cities that adopt the ASME Boiler and Pressure Vessel Code bring Section V in with it, through the construction sections that reference it. Authorized inspectors check examinations against it.
- Full title
- BPVC Section V: Nondestructive Examination
- Issued by
- ASME
- Current edition
- 2025 edition
- Applies to
- Examinations called for by Sections I, III, VIII, and XI, B31.1, B31.3, and other codes that reference it
- Required by
- The referencing construction code, and jurisdictions that adopt the Boiler and Pressure Vessel Code
- Main articles
- Art 2 radiography · Art 4 ultrasonic for welds · Art 6 penetrant · Art 7 magnetic particle · Art 9 visual
- Personnel
- Qualified to the referencing code, usually through SNT-TC-1A or CP-189
- Acceptance comes from
- The referencing code, not Section V
Who it's for
One record. Both sides of the job.
How inspection works
Methods under ASME Section V.
Who sets the procedure, who sets acceptance, and who may do the work, method by method.
| Method | Procedure | Acceptance | Certification |
|---|---|---|---|
| Radiographic (RT) | Article 2 | The referencing code (Section I, VIII, B31.1, B31.3) | Per the referencing code; SNT-TC-1A or CP-189 |
| Ultrasonic (UT), welds | Article 4 | The referencing code; Section VIII has its own UT acceptance in a mandatory appendix | Per the referencing code; SNT-TC-1A or CP-189 |
| Penetrant (PT) | Article 6 | The referencing code | Per the referencing code; SNT-TC-1A or CP-189 |
| Magnetic particle (MT) | Article 7 | The referencing code | Per the referencing code; SNT-TC-1A or CP-189 |
| Visual (VT) | Article 9 | The referencing code | Per the referencing code |
Acceptance criteria
How a weld passes or fails.
Section V sets no accept or reject limits for welds. What it does set decides whether an examination counts at all.
- Radiography: the IQI is selected by material thickness, and the image has to reach the required density and show the essential wire or hole.
- Ultrasonic: the instrument is calibrated on a block of the right material and thickness, and the reference level is set before scanning.
- Penetrant and magnetic particle: surface preparation, dwell or magnetization, and lighting have to meet the article before indications can be judged.
- Every examination follows a written procedure, and the record names it.
- Once the examination is valid, the referencing code's criteria decide each indication.
That's why a Section V report has to name two documents: the article the examination followed, and the code whose acceptance criteria were applied.
A summary, not the code. Limits and exceptions are in the edition your job works to.
The report
What ASME Section V reports have to carry.
The fields a Level III checks before signing. Miss one and the report comes back.
- Component, weld ID, drawing, and the referencing code
- Section V edition, the article followed and the written procedure number and revision
- Material and thickness
- Equipment and calibration: for RT, the source or kV, film or detector, and IQI; for UT, the instrument, probe, and calibration block
- Coverage examined
- Each indication: type, location, size, and the call against the referencing code's criteria
- Disposition and repairs
- Examiner name, certification level and signature; review sign-off
Standards logic
Checked at capture, not after the report.
Where Weld Done holds a code's acceptance limits, each RT, VT, and UT indication is checked against them as it's entered. A rejected one shows the clause, the value, and the limit.
Standards logic →Where reports go wrong
The ASME Section V mistakes that send a report back.
How the job's procedures come from your plan
The NDT reporting checklist: eight ways to get reports right the first time
The wrong ASME section.
A tech picks the wrong section for boiler piping. Section V says how to examine; the boiler, vessel, or piping code decides what passes.
No acceptance code on the report.
A report that cites Section V and nothing else can't be accepted: Section V has no acceptance criteria for welds.
The procedure isn't named.
Without the written procedure number and revision, the reviewer can't confirm the examination was valid.
An IQI that doesn't match the thickness.
The wrong IQI for the material thickness makes the whole radiograph invalid, whatever it shows.
Related codes
The codes around it.
From the blog: The ASME code's two-year edition cycle · NDE 4.0 and the inspection record
Edition referenced: 2025 edition. All codes and standards
FAQ
Questions.
Every other answer is on the FAQ page.
What is ASME Section V Article 2?
The article on radiographic examination. It sets the procedure, IQI selection, image quality and record requirements for radiography called for by another ASME code.
What is ASME Section V Article 4?
The article on ultrasonic examination of welds. It sets the procedure, equipment, calibration, and scanning requirements. The referencing code sets acceptance.
Does ASME Section V have acceptance criteria?
Not for welds. Section V says how to examine. The code that calls for the examination, such as Section VIII or B31.3, sets the acceptance criteria.
Which edition of Section V applies?
The one the referencing code and the construction contract name. The BPVC is reissued every two years, and the 2025 edition is the latest.