Code
CSA W59: welded steel construction in Canada.
The Canadian code for welded structural steel: how the welds are designed, made, inspected, and accepted, from buildings to industrial structures.
What it covers
CSA W59 in plain terms.
CSA W59 covers welding of structural steel in Canada: the design of welded connections, welding procedures, workmanship, inspection, and the quality a weld must reach.
It works alongside two other standards. CSA S16 designs the steel structure and points to W59 for the welding. CSA W47.1 certifies the company doing the welding, through the CWB. A W59 job is done by a W47.1-certified company.
Like AWS D1.1, it separates statically loaded structures from cyclically loaded ones, and the acceptance criteria differ between them.
Ultrasonic testing does much of the volumetric inspection on W59 work, and the code includes requirements for advanced UT, such as phased array.
Where it’s used: Construction and infrastructure
Regulation
Canadian building codes adopt CSA S16 for steel structures, which requires welding to CSA W59 by companies certified to CSA W47.1. Provinces adopt the building code, so the edition in force can vary.
- Full title
- Welded steel construction
- Issued by
- CSA Group
- Edition
- W59-18
- Applies to
- Welded carbon and low-alloy steel structures in Canada, statically and cyclically loaded
- Required by
- Canadian building codes, through CSA S16 for steel structures, and project specifications
- Company certification
- Fabricators and erectors certified by the CWB to CSA W47.1
- Certification
- CAN/CGSB-48.9712 for nondestructive testing; CWB welding inspector for visual
- Related codes
- AWS D1.1 is the US counterpart · CSA Z662 for pipelines
Who it's for
One record. Both sides of the job.
How inspection works
Methods under CSA W59.
Who sets the procedure, who sets acceptance, and who may do the work, method by method.
| Method | Procedure | Acceptance | Certification |
|---|---|---|---|
| Visual (VT) | CSA W59, every weld | W59 quality requirements, by loading | CWB-certified welding inspector |
| Ultrasonic (UT), incl. phased array | CSA W59 ultrasonic requirements | W59 ultrasonic acceptance criteria, by loading | CAN/CGSB-48.9712, UT |
| Radiographic (RT) | CSA W59 radiographic requirements | W59 radiographic acceptance criteria | CAN/CGSB-48.9712, RT |
| Magnetic particle (MT) | CSA W59 requirements | W59 criteria | CAN/CGSB-48.9712, MT |
| Penetrant (PT) | CSA W59 requirements | W59 criteria | CAN/CGSB-48.9712, PT |
Acceptance criteria
How a weld passes or fails.
W59 acceptance depends on the method and on whether the structure is statically or cyclically loaded. Cyclically loaded work gets tighter limits.
- Cracks reject the weld.
- Visual criteria limit fusion, undercut, weld size and profile, crater fill and surface porosity.
- Ultrasonic indications are rated against a reference level and judged by severity and length, with separate tables for each loading.
- Radiographic indications are limited by size and spacing against the weld size.
- Repairs are made to an approved procedure and re-inspected by the same method.
The project specification sets how much of the work is inspected and by which method, and it can add requirements to the code's.
A summary, not the code. Limits and exceptions are in the edition your job works to.
The report
What CSA W59 reports have to carry.
The fields a Level III checks before signing. Miss one and the report comes back.
- Project, client, drawing, member, and joint ID
- Welding procedure data sheet and welder ID, with the company's W47.1 certification
- Material, thickness, and joint type
- W59 edition, and statically or cyclically loaded
- Method and technique; for UT, the probe, angle, reference level and scanning
- Each indication: location, size or rating, length, and the accept or reject call
- Disposition per weld, and repair and re-inspection
- Technician name, CGSB or CWB certification and level, signature, and date
Where reports go wrong
The CSA W59 mistakes that send a report back.
How the job's procedures come from your plan
The NDT reporting checklist: eight ways to get reports right the first time
D1.1 out of habit.
A Canadian crew that also works US jobs reaches for D1.1. Close isn't the same: the job is accepted to W59.
The wrong loading criteria.
Cyclically loaded steel called against statically loaded limits passes welds the code would reject.
No W47.1 trail.
The report doesn't tie the weld to a certified company's approved procedure, so the owner can't show the chain.
UT without its reference level.
A severity class with no reference level or probe data can't be checked by the reviewer.
Related codes
The codes around it.
From the blog: AWS D1.1 inspection moved to Clause 8
Edition referenced: W59-18. All codes and standards
FAQ
Questions.
Every other answer is on the FAQ page.
What is CSA W59?
The Canadian standard for welded steel construction. It covers welded connection design, welding procedures, workmanship, inspection, and acceptance for structural steel.
How is ultrasonic testing done under CSA W59?
W59 sets the UT procedure, the reference level indications are rated against, and acceptance criteria by severity and length, with separate criteria for statically and cyclically loaded work. It also covers advanced UT such as phased array.
What's the difference between CSA W59 and AWS D1.1?
They cover the same ground on either side of the border. W59 is used in Canada with CSA S16 and W47.1 company certification; D1.1 is used in the US. Their limits and procedures differ in detail.
Who can weld to CSA W59?
Companies certified by the CWB to CSA W47.1, using their approved procedures and qualified welders.

See your own report rebuilt.
Book a 30-minute demo on one of your real reports.
Not ready to talk? The calculator works out hours and costs back from your own numbers.

