ISO 23278: acceptance levels for magnetic particle testing.
The international standard that decides whether a magnetic particle indication on a weld is acceptable, at one of three acceptance levels.
What it covers
ISO 23278 in plain terms.
ISO 23278 is the acceptance half of magnetic particle testing on welds. ISO 17638 produces the indications; ISO 23278 decides which ones the weld can keep.
It sorts indications into linear and non-linear by their shape: an indication much longer than it is wide is linear, and linear indications are treated more strictly because they usually mean cracks or lack of fusion.
It works in three acceptance levels matched to ISO 5817 quality levels. The design names the quality level, and the acceptance level follows.
Indications below a recording level aren't recorded at all. Above it, each is measured and judged against the limit for its type and level.
- Full title
- Non-destructive testing of welds — Magnetic particle testing — Acceptance levels
- Issued by
- ISO, adopted in Europe as EN ISO 23278
- Current edition
- ISO 23278:2015
- Acceptance levels
- 1, 2, and 3, from the strictest
- Linked to
- ISO 5817 quality levels B, C, and D
- Technique standard
- ISO 17638
- Indications
- Linear and non-linear, judged by length
Who it's for
One record. Both sides of the job.
How inspection works
Methods under ISO 23278.
Who sets the procedure, who sets acceptance, and who may do the work, method by method.
| Method | Procedure | Acceptance | Certification |
|---|---|---|---|
| Magnetic particle (MT) | ISO 17638 | ISO 23278 at acceptance level 1, 2, or 3 | ISO 9712 MT Level II |
Acceptance criteria
How a weld passes or fails.
Each indication is classed as linear or non-linear, measured, and judged against the length limit for the acceptance level.
- Indications below the recording level are ignored.
- Linear indications have tighter length limits than non-linear ones at every acceptance level.
- Acceptance level 1 is the strictest; acceptance level 3 allows the longest indications.
- Grouped indications can be judged together where they're close enough to act as one.
- A weld with an unacceptable indication is repaired, or the indication is investigated further, then the weld is retested.
The report has to state the acceptance level, because the same indication can pass at acceptance level 3 and fail at acceptance level 1.
A summary, not the code. Limits and exceptions are in the edition your job works to.
The report
What ISO 23278 reports have to carry.
The fields a Level III checks before signing. Miss one and the report comes back.
- Weld and component ID
- ISO 5817 quality level and ISO 23278 acceptance level applied
- Reference to the ISO 17638 test record
- Each recorded indication: linear or non-linear, location, and length
- Accept or reject per indication and per weld
- Repairs and retest
- Interpreter name, ISO 9712 certification and date
Where reports go wrong
The ISO 23278 mistakes that send a report back.
How the job's procedures come from your plan
The NDT reporting checklist: eight ways to get reports right the first time
No acceptance level stated.
Without it, an MT call can't be checked against what the design asked for.
Linear judged as non-linear.
A crack-like indication measured against the looser non-linear limit passes when it shouldn't.
Indications not measured.
Acceptance is by length. An indication described but not measured can't be judged.
Related codes
The codes around it.
Edition referenced: ISO 23278:2015. All codes and standards
FAQ
Questions.
Every other answer is on the FAQ page.
What are ISO 23278 acceptance levels?
Three levels, 1 to 3, with level 1 the strictest. They match ISO 5817 quality levels B, C, and D.
What's a linear indication?
An indication much longer than it is wide. Linear indications usually mean cracks or lack of fusion, so they have tighter limits than rounded, non-linear ones.
How does ISO 23278 relate to ISO 17638?
ISO 17638 sets how the magnetic particle test is done. ISO 23278 sets which of the resulting indications are acceptable.

See your own report rebuilt.
Book a 30-minute demo on one of your real reports.
Not ready to talk? The calculator works out hours and costs back from your own numbers.