
Method
Visual testing for weld inspection.
VT is the inspector's eyes on the weld, with good light, gauges, and, where needed, a magnifier or borescope. It's the first check on every weld. Here's how it's done, which codes set its rules, who can perform it, and what a VT report has to carry.
- When
- At fit-up, during welding, and on the finished weld
- Procedure
- ASME Section V, Article 9
- Acceptance
- The code the job is built to
- Inspector
- Certified to SNT-TC-1A or CP-189, or an AWS Certified Welding Inspector where the code allows
How it works
Visual testing in plain terms.
The inspector looks at the weld and the metal beside it, with enough light on the surface and, where the weld is out of reach, a mirror or borescope. Gauges measure weld size, reinforcement, and undercut, so the call rests on numbers, not on a glance.
It's usually the first check on every weld, before any other method is used, and it can run at fit-up and between passes as well as on the finished weld. The code the job is built to says what's measured and what passes.
In the glossary: Undercut
Techniques
Direct and remote visual testing.
Direct visual testing is the inspector's own eye on the weld. ASME Section V, Article 9 sets it up as the eye within about 24 inches (600 mm) of the surface, at an angle of at least 30 degrees, with at least 100 foot-candles (1,000 lux) of light. A mirror can improve the angle into a tight spot.
Remote visual testing uses a borescope, videoscope, or camera where the eye can't get close, such as inside a pipe or behind a structure. It can replace direct viewing when it resolves at least as well, which is why the procedure checks it against a resolution target.
The gauges do the measuring: fillet weld gauges for leg and throat size, a bridge cam gauge for reinforcement, undercut, and misalignment, and a hi-lo gauge for fit-up on pipe.
Before, during, and after welding.
VT is the only method that runs through the whole job. Before welding, the inspector checks joint preparation, fit-up, root opening, and cleanliness. During welding, they check the root pass, cleaning between passes, and preheat and interpass temperatures where the WPS sets them. After welding, they check the finished weld's size, profile, and surface. Problems caught at fit-up cost minutes; the same problems found on a finished weld cost a repair.
Strengths and limits
Where VT works and where it stops.
It's fast and cheap, and it needs little beyond good light and gauges. That's why it runs on every weld and at every stage, from fit-up to the finished weld. It catches problems early, before slower and more expensive methods are used.
It only sees the surface. A weld that looks right can still hide lack of fusion or slag, which is why critical welds also get RT or UT. The result depends on access, lighting, and the inspector, so the report has to record the measurements and not just the call.
Who can perform VT
Who can perform VT.
Like every NDT method, VT is performed by inspectors certified to SNT-TC-1A or CP-189, usually at Level II to make the accept or reject call. On structural steel and many fabrication jobs, VT is often done by an AWS Certified Welding Inspector (CWI) instead. The code the job is built to and the client's specification say which is accepted. Whoever performs it passes a near-vision exam every year and a color contrast check.
The report
What a VT report has to carry.
The fields a Level III checks before signing, in the order the report runs. Miss one and the report comes back.
The job
- Job, client, and location
- Drawing or line number
- Weld ID and welder ID
Procedure and material
- WPS reference
- Material, diameter, and wall thickness
- Governing code and the acceptance criteria applied
Technique and equipment
- Direct or remote viewing
- Lighting at the surface
- Aids used: magnifier, mirror, or borescope
- Gauges used to measure size and profile
- Stage inspected: fit-up, between passes, or final
Results
- Each indication: type, location, measured size, and the accept or reject call
- Final disposition per weld
- Repair tracking
Sign-off
- Technician name, cert level, and signature
- Reviewer sign-off and date
How Weld Done builds your NDT report template
Standards logic
Checked at capture, not after the report.
Each VT indication is checked against the acceptance limits as it's entered. A rejected one shows the clause, the value, and the limit.
Standards logic →Where reports go wrong
What sends a VT report back.
- No measurements
- Undercut or reinforcement judged by eye, with no gauge reading on the report for the Level III to check against the limit.
- Stage not recorded
- A report that doesn't say whether the weld was seen at fit-up, between passes, or finished, so nobody knows what was actually looked at.
- Acceptance from the wrong code
- A structural weld judged against pipeline limits, because the last job's template was copied.
The NDT reporting checklist: eight ways to get reports right the first time
From the blog: NDT methods for steel bridges
FAQ
Questions.
Every other answer is on the FAQ page.
What does a visual weld inspection report have to include?
The job and weld, the procedure and material, the governing code and acceptance criteria, how the weld was viewed and with what light and aids, the gauges used, each indication with its measurement and call, and the technician's and reviewer's signatures.
Is visual testing required on every weld?
Most codes call for a visual inspection of every weld. The code the job is built to says what's required and what passes.
Who can perform visual weld inspection?
An inspector certified to SNT-TC-1A or CP-189, or an AWS Certified Welding Inspector where the code and the client's specification accept one.
How much light does visual testing need?
ASME Section V, Article 9 calls for at least 100 foot-candles (1,000 lux) at the surface. ISO 17637 calls for at least 350 lux, with 500 lux recommended. The procedure for the job sets the minimum, and the report records the light used.
Can we download a VT report template?
Not yet. Until there's a sample report we can publish, this page lists everything the report has to carry.
A summary, not the code: procedures and limits are in the edition your job works to.

See your own report rebuilt.
Book a 30-minute demo on one of your real reports.
Not ready to talk? The calculator works out hours and costs back from your own numbers.