Code
API 510: inspecting pressure vessels in service.
The code for keeping pressure vessels safe once they're running: how often they're inspected, how corrosion is measured, and who decides whether they stay in service.
What it covers
API 510 in plain terms.
API 510 starts where the construction code stops. ASME Section VIII decides how a vessel is built; API 510 decides how it's inspected, rated, repaired, and altered for the rest of its life.
Its core is corrosion. Wall thickness is measured at the same condition monitoring locations every time, the corrosion rate is worked out from the change, and the remaining life follows from how much metal is left above the minimum required thickness.
The remaining life sets the next inspection date. Internal and on-stream inspections, and external visual inspections, each have their own interval, and a risk-based inspection program can set them instead.
Repairs and alterations need the authorized inspector's approval before work starts, and a pressure test or approved alternative after.
Where it’s used: Oil, gas, and petrochemical
In the glossary: In-service inspection
Regulation
OSHA's process safety management rule requires mechanical integrity programs for covered process equipment, and API 510 is the recognized practice for pressure vessels in refining. Some states and provinces accept it in place of their own in-service rules.
- Full title
- Pressure Vessel Inspection Code: In-Service Inspection, Rating, Repair, and Alteration
- Issued by
- American Petroleum Institute (API)
- Current edition
- 11th edition, 2022
- Applies to
- Pressure vessels in refining and petrochemical service after they've been placed in operation
- Required by
- Owners' mechanical integrity programs, and jurisdictions that accept it for in-service vessels
- Inspector
- An API 510 authorized inspector, certified through API's individual certification program
- Built to
- ASME Section VIII, or the code the vessel was built to
- Related codes
- API 570 for piping · API 653 for tanks · NBIC for repairs outside refining
Who it's for
One record. Both sides of the job.
How inspection works
Methods under API 510.
Who sets the procedure, who sets acceptance, and who may do the work, method by method.
| Method | Procedure | Acceptance | Certification |
|---|---|---|---|
| Visual (VT) | External and internal visual inspection, per the owner's inspection plan | The authorized inspector's assessment against API 510 and fitness-for-service rules | API 510 authorized inspector |
| Ultrasonic thickness (UT) | Thickness readings at condition monitoring locations | Minimum required thickness from the construction code; remaining life per API 510 | UT Level II, or a qualified thickness technician |
| Advanced UT (phased array, corrosion mapping) | Per the owner's procedure and ASME Section V | Fitness-for-service assessment | UT Level II with the technique's qualification |
| Magnetic particle (MT) | Wet fluorescent MT for cracking, per ASME Section V | Construction code criteria, or fitness-for-service | MT Level II |
| Radiographic (RT) | ASME Section V Article 2, for repairs and profile shots | The construction code's criteria for repair welds | RT Level II, plus radiation safety |
Acceptance criteria
How a weld passes or fails.
API 510 doesn't accept or reject a weld the way a construction code does. It decides whether the vessel can keep running, at what pressure, and until when.
- Measured thickness is compared with the minimum required thickness for the vessel's design conditions.
- Long-term and short-term corrosion rates are worked out from the thickness history; the more conservative one usually governs.
- Remaining life is the metal left above minimum, divided by the corrosion rate. The next inspection falls inside it.
- Damage that's beyond the simple rules, such as local thin areas, pitting, or cracking, is assessed for fitness for service, usually to API 579-1/ASME FFS-1.
- Repair welds are made and examined to the construction code, under the inspector's approval.
The report is a decision record as much as a measurement record: it says what was found, what it means for the vessel, and when it gets looked at again.
A summary, not the code. Limits and exceptions are in the edition your job works to.
The report
What API 510 reports have to carry.
The fields a Level III checks before signing. Miss one and the report comes back.
- Vessel ID, unit and service, with its design data (MAWP, temperature, corrosion allowance)
- Inspection type: internal, on-stream, or external, and the inspection plan it follows
- Thickness readings at each condition monitoring location, against previous readings
- Corrosion rates, minimum required thickness and remaining life
- Findings: damage mechanism, location, size, with photographs
- Fitness-for-service results where used
- Recommendations and the next inspection dates
- Inspector name, API 510 certification number and signature
Where reports go wrong
The API 510 mistakes that send a report back.
How the job's procedures come from your plan
The NDT reporting checklist: eight ways to get reports right the first time
Pages of narrative, no checks.
In-service reports often run long, in free text, with nothing checking that a reading or a rate adds up. Errors surface at the next turnaround, or never.
Readings not tied to the same locations.
A thickness taken a few inches from last time's point makes the corrosion rate meaningless.
The wrong rate governs.
Using the long-term rate when the short-term one is faster pushes the next inspection past the vessel's real remaining life.
A repair without approval on file.
The weld may be fine, but without the authorized inspector's approval in the record, the repair can't be shown to meet the code.
Related codes
The codes around it.
Edition referenced: 11th edition, 2022. All codes and standards
FAQ
Questions.
Every other answer is on the FAQ page.
What does API 510 cover?
In-service inspection, rating, repair, and alteration of pressure vessels, mainly in refining and petrochemical service. Construction is covered by ASME Section VIII; API 510 takes over once the vessel is running.
How often are vessels inspected under API 510?
Intervals come from the corrosion rate and remaining life, with maximums set by the code for internal, on-stream, and external inspections. A risk-based inspection program can set different intervals.
Who can sign an API 510 inspection?
An authorized inspector certified by API for API 510. NDT technicians take the measurements; the authorized inspector evaluates them and makes the call.
What's the difference between API 510 and ASME Section VIII?
Section VIII is the construction code for new vessels. API 510 is the in-service code that governs inspection, rating, repair, and alteration after the vessel goes into operation.

See your own report rebuilt.