Code

ASME Section VIII: building pressure vessels.

The ASME code for designing and building pressure vessels, and for examining their welds before the vessel is stamped and put in service.

BPVC Section VIII: Rules for Construction of Pressure Vessels · ASME · 2025 edition

What it covers

ASME Section VIII in plain terms.

Section VIII sets the rules for new pressure vessels: design, materials, fabrication, examination, testing, and the stamp. Most vessels are built to Division 1.

In Division 1, the extent of radiography and the strength the code allows for a welded joint are tied together. A fully radiographed joint gets full credit; spot radiography or none means a lower joint efficiency and a thicker vessel.

Section VIII uses Section V for how to examine and Section IX for welding qualification, and keeps the acceptance criteria for itself: full radiography, spot radiography, rounded indications, ultrasonic, magnetic particle and penetrant each have their own rules.

An Authorized Inspector from an inspection agency checks the fabrication and examination records, and the manufacturer's data report records what was done before the vessel is stamped.

Where it’s used: Oil, gas, and petrochemical

In the glossary: Acceptance standard · Authorized Inspector · Linear and rounded indications

Regulation

Jurisdictions that adopt the ASME Boiler and Pressure Vessel Code require new pressure vessels to be built to Section VIII, inspected by an Authorized Inspector, stamped and, in many places, registered with the National Board.

Full title
BPVC Section VIII: Rules for Construction of Pressure Vessels
Issued by
ASME
Current edition
2025 edition
Divisions
Division 1, the common rules · Division 2, alternative rules with more analysis · Division 3, high pressure
Required by
States, provinces, and cities that adopt the Boiler and Pressure Vessel Code
Examination methods
ASME Section V
Welding qualification
ASME Section IX
Third party
An Authorized Inspector checks the work before the vessel is stamped

Who it's for

One record. Both sides of the job.

How inspection works

Methods under ASME Section VIII.

Who sets the procedure, who sets acceptance, and who may do the work, method by method.

MethodProcedureAcceptanceCertification
Radiographic (RT), full or spotASME Section V Article 2Section VIII Division 1 full or spot radiography criteria, with the rounded indication chartsSNT-TC-1A or CP-189 Level II
Ultrasonic (UT)ASME Section V Article 4Section VIII Division 1 Mandatory Appendix 12SNT-TC-1A or CP-189 Level II
Magnetic particle (MT)ASME Section V Article 7Section VIII Division 1 Mandatory Appendix 6SNT-TC-1A or CP-189 Level II
Penetrant (PT)ASME Section V Article 6Section VIII Division 1 Mandatory Appendix 8SNT-TC-1A or CP-189 Level II
Visual (VT)ASME Section V Article 9Section VIII workmanship requirementsPer the manufacturer's quality program

Acceptance criteria

How a weld passes or fails.

In Division 1, acceptance depends on the method and, for radiography, on whether the joint was fully or spot radiographed.

  • Full radiography: cracks, incomplete fusion and incomplete penetration reject; elongated indications are limited by length against thickness; rounded indications are judged against the charts in a mandatory appendix.
  • Spot radiography: one spot per increment of weld; a spot that fails triggers two more, and failures there put the whole increment to repair or full radiography.
  • Ultrasonic examination, where allowed in place of radiography, is accepted to Mandatory Appendix 12.
  • Magnetic particle and penetrant indications are judged to Appendices 6 and 8: relevant linear and rounded indications are limited by size and spacing.
  • Repairs are re-examined by the original method.

The joint efficiency used in the design, the extent of radiography and the acceptance standard applied all have to agree in the record.

A summary, not the code. Limits and exceptions are in the edition your job works to.

The report

What ASME Section VIII reports have to carry.

The fields a Level III checks before signing. Miss one and the report comes back.

  • Vessel and job number, drawing, and seam ID
  • Section VIII division and edition, and the joint category and type
  • Extent of examination: full, spot, or none, and the spot locations
  • Method and procedure per Section V; for RT, the IQI, density, and technique
  • Each indication: type, location, size, and the call against the Section VIII criteria
  • Spot-radiography follow-up shots and repairs
  • Examiner name, certification level and signature
  • Manufacturer's review and the Authorized Inspector's acceptance

How Weld Done builds your NDT report template

Standards logic

Checked at capture, not after the report.

Where Weld Done holds a code's acceptance limits, each RT, VT, and UT indication is checked against them as it's entered. A rejected one shows the clause, the value, and the limit.

Standards logic →
  1. The wrong ASME section.

    Boiler piping, a pressure vessel and process piping each have their own book. A tech who picks Section VIII for boiler piping calls the welds against the wrong rules.

  2. Spot rules without the follow-up.

    A failed spot needs two more shots, and the record has to show them, or the increment can't be accepted.

  3. Radiography that doesn't match the design.

    A seam designed for full joint efficiency but only spot radiographed doesn't meet the code.

  4. Section V named as the acceptance standard.

    Section V says how to examine; Section VIII says what passes.

Related codes

The codes around it.

From the blog: The ASME code's two-year edition cycle

Edition referenced: 2025 edition. All codes and standards

FAQ

Questions.

Every other answer is on the FAQ page.

Visit FAQ
What does ASME Section VIII cover?

The rules for designing, building, examining, testing, and stamping new pressure vessels. Division 1 holds the common rules; Divisions 2 and 3 cover alternative and high-pressure rules.

What's the difference between full and spot radiography?

Full radiography examines the whole length of a welded joint and earns full joint efficiency. Spot radiography examines a sample and earns less, and a failed spot triggers more examination.

Where are the Section VIII ultrasonic acceptance criteria?

In Division 1 Mandatory Appendix 12. Section V Article 4 sets how the ultrasonic examination is done.

Does Section VIII cover vessels in service?

No. Section VIII is for construction. In-service inspection is API 510 in refining, or the NBIC elsewhere.